Here we have two recent projects . The first involved the preparations and excavation of footings for a large extension to Northway community centre. The footings ranged from 1 metre deep to 2 meters due to the ground conditions,which in total produced over 130tons of spoil which in turn was removed to tip or recycled by our grab lorry. Due to our large range of excavators and fleet of hgv s coupled with our skilled operators we are able to carry out small to large projects. The other project involved the recycling of hardcore we have produced from projects carried out over the last eighteen months. The crusher is on hire from smiths plant Gloucester and loaded by ourselves. The mix of concrete and  old Tarmac drives are crushed down into a reusable 50 mm down material and a separate 100mm material for use in future projects,in all approximately 900 tons of material was recycled saving on land fill and money.