Pave Your Way, Deer Park, Ledbury, Herefordshire, HR8 2XA

New shed base and paths at Newtown cross rds Herefordshire

This project involved replacing an old path that had become uneven and slippery in wet conditions with a new wider and more safer surface. A textured buff slab was chosen to achieve this . Also required was a new base for a secure shed supplied by NFP sectional buildings of Colwall nr Malvern . A 4inch concrete slab was first laid on a hardcore base . Once the concrete became hardened a single engineering brick was laid to the dimensions of the shed .

Request a quote

Fill out this form and we'll get back to you as soon as possible.