The project was to remove existing concrete drive that only provided parking for one car. An area of approx 70sq metres was excavated to a depth of 210 mm and all spoil was removed from site. A 150 mm layer of compacted sub base was then added with a brindle Pavior concreted in place to provide an edging before a 60mm layer of 10mm hot rolled asphalt was compacted in two layers to provide off road parking for three vehicles . The finished site was then swept to leave it clean and tidy ready for use .