The driveway at this property required a total refurbishment of the existing drive. First new concrete kerb edgeing was concreted in place around the edges and around the small planted areas around the house. Next the old gravel surface was removed and a layer of new sub base layed and compacted before the finished surface of a 50 mm layer of 20mm Forest of Dean chippings is layed. To complete the drive the entrance area was tarmaced to leave a new and smart drive.





